What does ATP stand for?

Meaning and background of ATP
Full formAcceptance Test Procedure
CategoryScience & engineering
TypeInitialism

The initialism ATP stands for Acceptance Test Procedure in engineering test documents. In this usage it identifies the procedure used to carry out an acceptance test.

NASA’s historical glossary records this expansion, and a 1999 NASA report identifies a particular ATP procedure by document number. A procedure specifies how a check is carried out; the recorded result describes what happened. The same letters can also mean Acceptance Test Plan, so keep the full document title and identifier rather than inferring its role from ATP alone.

ATP — Acceptance Test Procedure; Science & engineering
Original reference card by AcronymIndex.

Meaning in context

Acceptance Test
The testing context in this document name, not a statement that acceptance has already occurred.
Procedure
The instructions for carrying out the check, rather than its recorded outcome.

Practical examples

Separate instructions from evidence

Before
We have the ATP file, so the display test passed.
After
The procedure describes the check; a separate execution record is needed to show the observed result.

State the observation

Before
The display should show READY, therefore it did.
After
Expected display: READY. Observed display: WAIT. Record the difference before assessing the criterion.

Original illustrative examples, not quotations or reports of actual events.

Use ATP with clarity

Does an ATP procedure document show that the test was actually performed and passed?

See all guidance

Identify the document

Expand the letters using the document’s own title.

Acceptance Test Procedure, with its identifier and revision.

Read the steps

Separate the action and expected observation.

Which action is followed by which expected display?

Read the result

Look for the actual execution record and observed outcome.

The procedure file is not the result record.

This compares two entered observations. It runs no test, creates no official record and decides no engineering acceptance.

Prepare an expected-versus-observed test note

Enter a small illustrative display criterion and the observed display. This does not execute a test or certify acceptance.

Your inputs stay in this browser. Confirm the details before using this example.

Help improve this entry

Spot a mistake or have a clearer example? Suggest a change.

Become a contributor

By AcronymIndex Editorial Team · Editorial policy

Copy this text

Select the text below and copy it.

Suggest an edit

Help the team improve this entry. Suggestions are reviewed before publication.

Fields marked * are required. Please leave out sensitive personal information.

Paste the specific wording, or select text in an entry before opening this form.

Tell us what to replace or add, and why it would help the reader.

An official organization, original document or other reliable reference, if relevant.

Your draft stays in this tab until you choose an email action. How we handle your information